Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordfence domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/matin/domains/matinco.net/public_html/en/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the essential-addons-for-elementor-lite domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/matin/domains/matinco.net/public_html/en/wp-includes/functions.php on line 6121
Feasibility Study of Solar-Wind-Combined Cycle Powerplants for Sarcheshmeh Copper Mine - Matin Energy Development Company

Feasibility Study of Solar-Wind-Combined Cycle Powerplants for Sarcheshmeh Copper Mine

Title of project

Techno-economic feasibility study for combined cycle, solar and wind powerplants for in Sarcheshme copper mine

Type of project

Study of the construction of 500 MW combined cycle powerplant and 50 MW solar powerplant and 30 MW wind powerplant in Sarcheshme copper mine

The employer

National Iranian Copper Industry co.

Project site

Sarcheshme copper mine

Contract start and end date

2021.06.22 to 2022.06.21

Gallery

Activities

پروژه های دیگر