Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordfence domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/matin/domains/matinco.net/public_html/en/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the essential-addons-for-elementor-lite domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/matin/domains/matinco.net/public_html/en/wp-includes/functions.php on line 6121
Kish Desalination Plant and Electrical Powerplant - Matin Energy Development Company

Kish Desalination Plant and Electrical Powerplant

Title of project

Basic design of Kish co-generation desalination plant and electrical powerplant with a capacity of 75 MW

Type of project

Design Review, technical calculations and determination of water and electricity production capacity, preparation of documents and technical specifications, determination of equipment type

The employer

Kish Water and Power Company

Project site

Kish Island

Contract start and end date

2008

Gallery

Activities

پروژه های دیگر