Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordfence domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/matin/domains/matinco.net/public_html/en/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the essential-addons-for-elementor-lite domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/matin/domains/matinco.net/public_html/en/wp-includes/functions.php on line 6121
Solar panel - Matin Energy Development Company

Solar panel

Description

The department of procurement of Matin, with the advice and order of the engineering department, supplies equipment with the desired quality and standards in a proper relationship with the world’s top manufacturers such as Jinko, AE Solar, Risen, and Trina Solar.

 

Services that can be provided:

  • Product inspection before delivery
  • Shipping and clearance of goods
  • Testing and technical review of imported products
  • Provision of spare parts and equipment support